Kinetic Electrical Hawkes Bay were engaged by the Napier City Council to provide a MCC suitable to deliver a constant power supply to this critical piece of plant. The MCC was itself rated to 4000amps and was fed by three 900KVA diesel generators. The MCC was a design build that involved extensive input to the design in conjunction with the electrical engineer.
Duration – six months
Staff Number Involved – four
Challenges – 4000a rated MCC
Undertaken By – Kinetic Electrical Hawkes Bay