Kinetic Electrical East Tamaki was engaged by Mason Engineers to provide an electrical design for a SBR wastewater treatment plant at Natadola beach in Fiji. The installation was carried out by local contractors, while the PLC and SCADA programming and on-site commisioning was conducted by Kinetic Electrical East Tamaki.
Duration – six months
Staff Number Involved – two
Challenges – remote overseas location
Undertaken By – Kinetic Electrical East Tamaki
Leave a Reply