Kinetic Electrical East Tamaki was engaged by Filtration Technology to provide electrical design and installation work for a softener plant addition to the Wanganui Water Treatment plant. The project included installation amd programming of a PLC and HMI screen for the softener control, which was integrated with the main plant PLC.
Duration – two months
Staff Number Involved – three
Challenges – integration with existing plant
Undertaken By – Kinetic Electrical East Tamaki
Leave a Reply