Kinetic Electrical East Tamaki provided the electrical design, installation and control programming for a new filter and UV treatment plant for the township of Tuai on the edge of the Urerewa National Park.
The plant was initially constructed in a shipping container in Auckland before being transported to site where final installation and commisioning was carried out.
Duration – Three months
Staff number involved – Four
Challenges – Installation in remote location
Undertaken by – Kinetic Electrical East Tamaki